Back to top
 

Golden Gate Bridge: ASTM, through its U.S. subsidiary Halmar International, awarded the contract for the seismic retrofit project



The ASTM Group has been awarded the contract for the seismic retrofit of the Golden Gate Bridge in San Francisco, one of the world’s most iconic infrastructures. The project, worth $863.9 million, was awarded by the Golden Gate Bridge Highway and Transportation District to Halmar International, the U.S. subsidiary of Itinera (the ASTM Group’s EPC company), which will act as General Contractor.

Opened in 1937, stretching 2.7 km and crossed by over 95,000 vehicles daily, the Golden Gate Bridge is undergoing an extensive modernization and safety plan. The phase assigned to Halmar represents the most critical and complex stage of the entire seismic retrofitting plan, aimed at maximizing the structure’s performance and ensuring its rapid reopening to traffic even in the event of high-intensity earthquakes. The works include structural interventions on the towers and spans, along with the installation of seismic energy dissipation devices to drastically reduce structural stress and preserve the bridge’s integrity. The project is expected to be completed by 2031.

The Golden Gate Bridge project reinforces ASTM’s position in the United Estates, where, through Halmar, the Group is currently involved in several projects, including the tunnel beneath the Potomac River in Washington, D.C. and major works in the New York area, such as the construction of the new Penn Station, the extension of the Q subway line to Harlem, and the renovation of certain areas and access roads at JFK International Airport.

Read the press release.

Don’t miss our news.